Case 02 of 04 · Săliștea Industrial Campus
European
Expansion Hub
A ready industrial base inside the EU for relocation, nearshoring or a second production site, without starting from land.
The case
Remove the eighteen months between deciding and producing
For a European company, the hard part of opening in Romania is rarely the land. It is the interval between deciding and producing. This asset removes most of it.

Inside the EU
Single market
No customs border to Western Europe
Operational from
Day one
4,800 m² of existing envelope
Corridor west
A1
Towards Hungary and Central Europe
Four strategies this site serves
Relocation: moving existing capacity into an EU member state with lower operating costs. Nearshoring: bringing production back inside the EU without leaving the customs union. Second production site: reducing dependence on a single plant with a genuinely independent one. CEE base: serving Romania and Central and Eastern Europe from inside the region.
Why an existing platform rather than a plot
A plot in an industrial park is cheaper to buy and slower to use: connection, groundworks, access and construction all sit ahead of you, each a separate permitting conversation. Here the grid connection is live and documented, the yard carries heavy vehicles and the offices exist. What remains is fit-out to your process.
Who this case suits
- European manufacturers relocating or adding capacity inside the EU
- Groups nearshoring production from longer supply chains
- Companies building a second, independent plant in Central and Eastern Europe
Where this case does not work
- Port or rail-dependent logistics. There is no rail siding and no waterway. This is a road location.
- Large-scale labour arbitrage. A commune of 2,155 people cannot staff a 300-person plant.
- Same-day delivery into Western Europe. Nădlac is roughly 320 km away; plan on overnight.
- Energy-intensive process. 241 kVA approved, with headroom to roughly 400 kVA. Beyond that the transformer must be replaced.
Entry sequence
A programme, not a purchase
The critical path is permitting for your specific activity, not the building.
I Secure
0–4 months. Acquisition and due diligence. Begin the operating-permit conversation for your activity in parallel; this is the long pole.
II Fit out
3–10 months. Adapt two or three halls to your process. Pilot line, local hires, supplier qualification.
III Transfer
9–18 months. Move volume across from the origin plant, running both until qualification completes.
IV Scale
18 months +. Remaining halls, then new build on the development reserve as volume justifies it.
Two things to establish before committing
Whether your activity is permissible on this site under the applicable urbanism documentation, and whether your power requirement fits inside the 241 kVA already approved. Both are answerable in weeks, and both should be answered before exchange.
Documentation
The full case pack
Twelve pages: this case in full, the asset, the electrical documentation, location and access, the transaction process and photography. Released on request, usually within the day.