Săliștea · Alba County · Transylvania
Buy time,
not just real estate.
A 4.5-hectare industrial platform with 4,800 m² of usable halls, its own 20 kV connection and four hectares of unbuilt land inside the fence.
Intravilan land
45,000
m² · 4.5 ha, single title, inside the built-up zone
Existing halls
4,800
m² across 8 separate units
Approved power
217
kW · 400 kVA transformer
Development reserve
40,000
m² not built on


The asset
Eight halls, a yard built for trucks, and four hectares of room to grow
The halls are usable and available immediately, free of operations. This is built envelope, utilities and land — not a running business.
01 8 separate halls
Four at roughly 6 m internal height, four at 3–4 m. Separate buildings allow separate functions — or separate tenants.
02 Heavy vehicle access
Asphalt approach, two industrial gates, concreted and paved yard, roughly 200 m of street frontage.
03 Administration and housing
Two office buildings for about 20 people, plus a newer residential block of 100 m² and 50 m² apartments.
04 Water, heat, fibre
Mains water and an own well, three wood-fired boilers, fibre-optic connectivity. Gas network at the property boundary, not yet connected.
05 Secured perimeter
Fully fenced, CCTV, exterior night lighting, controlled gates. No alarm system — a buyer installs to their own standard.
06 300+ mature trees
Walnut, fruit and mature shade trees across the site. Unusual for an industrial platform, and a real asset when recruiting engineers.






Site photography, August–October 2026. Interior contents and machinery are not part of the sale.
Electrical capacity
217 kW approved today. Headroom to roughly 400 kVA.
The site has its own 20 kV connection and a dedicated transformer station. A buyer needing more power applies for an increase through the standard grid procedure — no new substation, no new infrastructure.
Transformer
400 kVA
Approved draw
241 kVA
Rooftop PV
27.4 kWp
Source: DEER connection certificate no. 7040220912331 / 21.02.2023. Available in full on request.



The 20 kV connection, and the rooftop photovoltaic array from the air and from the yard.
Location & access
Central Transylvania, on the corridor west
Săliștea, Alba County — not to be confused with Săliște in Sibiu County, 80 km away.
| DN7 / E68 | ≈ 5 km |
| A1 motorway access | ≈ 17 min |
| Sebeș | ≈ 21 km |
| Alba Iulia | ≈ 27 km |
| Sibiu airport | ≈ 90 km |
| Hungarian border, Nădlac | ≈ 320 km |
Indicative figures pending on-site verification. Confirmed drive times will be added to the case packs.
Săliștea, Alba County, between Sebeș, Alba Iulia and the A1 corridor.

The estate at the edge of the village, with farmland beyond. October 2026.
Four investment cases
The same asset answers four different investment questions
Rather than one listing for everyone, each case is worked through in its own right — capacity, phasing, and what the site does and does not support. Each has its own overview page and its own case pack.

Case 01
Owner-Occupier Industrial Campus
Buy, occupy, expand
Move into 4,800 m² of existing halls while a greenfield project would still be in permitting, then develop the remaining four hectares in phases as the operation grows.
Manufacturer or technical operator needing space in 6–12 months

Case 02
European Expansion Hub
Relocation, nearshoring, second site
A ready industrial base inside the EU for a company moving capacity closer to European customers, or reducing dependence on a single plant.
European group opening or relocating production into Romania

Case 03
Industrial Income Campus
Multi-tenant yield
Eight physically separate halls means eight lettable units. Shared maintenance, security and logistics make the operating model work, with development upside on the free land.
Investor buying income and repositioning potential, not occupancy

Case 04
Defence & Dual-Use Campus
Compartmentalised production
Separate buildings allow physically segregated flows for production, storage and quality control. Offered as industrial real estate — not as an authorised or accredited facility.
Tier 2–3 suppliers and dual-use manufacturers
Documentation
The detail is a PDF away
Each case has its own twelve-page pack. Tell us who you are and what you are looking for, and the pack is released to you, usually within the day.
🔒 Case pack for the case you choose, twelve pages
🔒 Property file: the asset, power, location and transaction
🔒 DEER connection certificate, in full
🔒 Photography and aerial video
🔒 Measured hall schedule and site plan, added as they are completed
Request the documentation
A few short questions so we can send the right pack rather than all of them. Every request is read by a person and answered from info@agilient.org.