Săliștea · Alba County · Transylvania

Buy time,
not just real estate.

A 4.5-hectare industrial platform with 4,800 m² of usable halls, its own 20 kV connection and four hectares of unbuilt land inside the fence.

Intravilan land

45,000

m² · 4.5 ha, single title, inside the built-up zone

Existing halls

4,800

m² across 8 separate units

Approved power

217

kW · 400 kVA transformer

Development reserve

40,000

m² not built on

Aerial overview of the Săliștea industrial estate
Open ground inside the estate, with the newer halls beyond
The asset

Eight halls, a yard built for trucks, and four hectares of room to grow

The halls are usable and available immediately, free of operations. This is built envelope, utilities and land — not a running business.

01   8 separate halls

Four at roughly 6 m internal height, four at 3–4 m. Separate buildings allow separate functions — or separate tenants.

02   Heavy vehicle access

Asphalt approach, two industrial gates, concreted and paved yard, roughly 200 m of street frontage.

03   Administration and housing

Two office buildings for about 20 people, plus a newer residential block of 100 m² and 50 m² apartments.

04   Water, heat, fibre

Mains water and an own well, three wood-fired boilers, fibre-optic connectivity. Gas network at the property boundary, not yet connected.

05   Secured perimeter

Fully fenced, CCTV, exterior night lighting, controlled gates. No alarm system — a buyer installs to their own standard.

06   300+ mature trees

Walnut, fruit and mature shade trees across the site. Unusual for an industrial platform, and a real asset when recruiting engineers.

The estate seen from the road, behind the perimeter wall
Two long tile-roofed halls from the air
Older building ranges along the central access road
Two-storey block-built building with adjoining hall
Hall interior with concrete floor and timber-beamed ceiling
Tile-roofed hall exterior

Site photography, August–October 2026. Interior contents and machinery are not part of the sale.

Electrical capacity

217 kW approved today. Headroom to roughly 400 kVA.

The site has its own 20 kV connection and a dedicated transformer station. A buyer needing more power applies for an increase through the standard grid procedure — no new substation, no new infrastructure.

Transformer

400 kVA

Approved draw

241 kVA

Rooftop PV

27.4 kWp

Source: DEER connection certificate no. 7040220912331 / 21.02.2023. Available in full on request.

The 20 kV connection serving the site
Hall with rooftop photovoltaic array, from the air
Hall with rooftop photovoltaic array, from the yard

The 20 kV connection, and the rooftop photovoltaic array from the air and from the yard.

Location & access

Central Transylvania, on the corridor west

Săliștea, Alba County — not to be confused with Săliște in Sibiu County, 80 km away.

DN7 / E68 ≈ 5 km
A1 motorway access ≈ 17 min
Sebeș ≈ 21 km
Alba Iulia ≈ 27 km
Sibiu airport ≈ 90 km
Hungarian border, Nădlac ≈ 320 km

Indicative figures pending on-site verification. Confirmed drive times will be added to the case packs.

Săliștea, Alba County

The map is provided by Google and loads only when you ask for it.

Săliștea, Alba County, between Sebeș, Alba Iulia and the A1 corridor.

The estate at the edge of Săliștea village

The estate at the edge of the village, with farmland beyond. October 2026.

Four investment cases

The same asset answers four different investment questions

Rather than one listing for everyone, each case is worked through in its own right — capacity, phasing, and what the site does and does not support. Each has its own overview page and its own case pack.

Aerial view of the estate
Case 01

Owner-Occupier Industrial Campus

Buy, occupy, expand

Move into 4,800 m² of existing halls while a greenfield project would still be in permitting, then develop the remaining four hectares in phases as the operation grows.

Manufacturer or technical operator needing space in 6–12 months

Aerial view of the halls and open ground
Case 02

European Expansion Hub

Relocation, nearshoring, second site

A ready industrial base inside the EU for a company moving capacity closer to European customers, or reducing dependence on a single plant.

European group opening or relocating production into Romania

Aerial view of the estate
Case 03

Industrial Income Campus

Multi-tenant yield

Eight physically separate halls means eight lettable units. Shared maintenance, security and logistics make the operating model work, with development upside on the free land.

Investor buying income and repositioning potential, not occupancy

Aerial view of the estate
Case 04

Defence & Dual-Use Campus

Compartmentalised production

Separate buildings allow physically segregated flows for production, storage and quality control. Offered as industrial real estate — not as an authorised or accredited facility.

Tier 2–3 suppliers and dual-use manufacturers

Documentation

The detail is a PDF away

Each case has its own twelve-page pack. Tell us who you are and what you are looking for, and the pack is released to you, usually within the day.

🔒  Case pack for the case you choose, twelve pages

🔒  Property file: the asset, power, location and transaction

🔒  DEER connection certificate, in full

🔒  Photography and aerial video

🔒  Measured hall schedule and site plan, added as they are completed

Request the documentation

A few short questions so we can send the right pack rather than all of them. Every request is read by a person and answered from info@agilient.org.