Case 03 of 04 · Săliștea Industrial Campus

Industrial
Income Campus

Eight physically separate halls, let individually: income from the existing envelope, with development upside on four hectares of unbuilt land.

The case

Eight buildings, not one concentration of risk

Most industrial assets of this size are one building with one tenant. This one is eight separate buildings, which makes a different investment possible.

Aerial view of the Săliștea estate
Lettable units

8

Physically separate buildings

Existing envelope

4,800 m²

Before any new build

Development land

40,000 m²

Subject to planning

Three sources of value

Income: eight lettable units from the existing envelope, let to several unrelated operators. Repositioning: selective modernisation of floors, lighting, metering and compartmentation, converting marginal space into lettable space. Development: roughly 40,000 m² unbuilt, for new units once tenant demand is proven.

Why separate buildings matter

Subdividing a single large hall is expensive and compromised: shared access, shared services and fire compartmentation to retrofit. Eight discrete buildings start where a subdivided hall tries to finish. Each can carry its own meter, its own access and its own lease, and a vacancy in one does not disturb the others.

Who this case suits

  • Investors buying income and repositioning potential rather than occupancy
  • Operators of multi-let light-industrial and storage space
  • Buyers comfortable with hands-on local management

Where this case does not work

  • Passive ownership. A multi-tenant campus in a rural commune needs local management.
  • Prime-yield expectations. Rents will sit below the A1 corridor at Sebeș; the return comes from entry price and repositioning.
  • Day-one income. The halls are usable, not necessarily lettable. Expect capex before the first lease.
  • Proven tenant demand. No letting evidence exists yet for this location; testing it is the first phase.
Phasing

A staged income plan

Each phase funds the next, and each can be stopped without stranding the one before it.

I   Acquire and survey

0–6 months. Technical survey of all eight buildings, individual metering and a local demand study before capital is committed to works.

II   Ready two units

4–12 months. Modernise the two best halls to lettable standard and test the market with them before touching the rest.

III   Stabilise

12–30 months. Roll the proven specification across the remaining halls, with shared security, maintenance and logistics.

IV   Develop

30 months +. New purpose-built units on the reserve, pre-let where possible.

On rental evidence

Regional figures for modern industrial space in Romania are typically quoted at 3.8 to 4.5 €/m² per month. Those describe modern halls near motorway junctions and are not a basis for underwriting this asset. Establishing local letting evidence is phase I work.

Documentation

The full case pack

Twelve pages: this case in full, the asset, the electrical documentation, location and access, the transaction process and photography. Released on request, usually within the day.